What We Do

Services

The full list of deck work we take on, including a few jobs people forget to ask about.

Home › Services

Everything we take on

Every job below is one we do ourselves across Carson.

Deck Installation

We dig footings below frost depth, set posts plumb, and frame joists to span tables for the actual load the deck will carry, not just a minimum. A ten-foot-high deck on a slope gets engineered different from a two-step platform off a sliding door, and we treat them that way.

Custom Deck Design

We'll sketch the layout with you first, picture framing, built-in bench seating, a change in board direction where the deck steps down. Multi-level decks and wraparounds take more planning on paper than most people expect, so we work out beam sizes and stair geometry before we order lumber.

Deck Repair

A board that flexes underfoot usually means the joist below it is splitting or the hanger's rusted through, not that the board itself is the problem. We pull up the decking to check the frame, fix what's actually failing, and only replace boards that won't hold a screw anymore.

Deck Staining & Sealing

Wood decking should get a fresh coat of sealer every one to three years depending on sun exposure, otherwise UV breaks down the fibers and it goes gray and brittle. We pressure wash, let the wood dry fully, and use a penetrating stain rather than a film-forming one that'll peel.

Composite Decking Installation

Composite boards don't rot or splinter, but they expand and contract with heat more than wood does, so gapping and fastening matter more, not less. We use hidden fastener clips sized for the board brand we're installing, and we leave the manufacturer's recommended gap at every butt joint.

Deck Railing Installation & Repair

Code calls for a 36 to 42 inch rail height depending on your city, with baluster spacing that keeps a 4 inch sphere from passing through. We rebuild posts that have gone loose at the base, which is almost always a bolt that's backed out or a post never through-bolted to the rim joist in the first place.

Deck Resurfacing & Board Replacement

If the frame underneath is still sound, we'll pull the old decking and lay new boards without touching the posts and joists. It's a faster, cheaper way to get a deck looking new again when the structure itself has years left in it.

Multi-Level Deck Construction

Stacked decks and decks that step down a slope require beams sized for cumulative load, since the lower level often carries the stair and landing weight of the level above. We work out those numbers before framing starts, not after something starts to sag.

Deck Demolition & Removal

Old decking, ledger boards, and footings in the way of a new layout all come out, and we haul the debris off ourselves. We'll flag anything we find mid-tear-out, like a ledger bolted straight through siding with no flashing, before we build on top of it again.

Pergolas & Deck Covers

A pergola or a solid cover changes how much a deck gets used in direct sun, especially on south-facing yards that get hit all afternoon. We frame these to tie into the existing deck structure, not just bolt a kit on top.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Carson, CA

Deck installation and repair covers Carson and the towns around it.

Carson, CA
Long Beach, CA
Anaheim, CA
Santa Ana, CA
Irvine, CA
Torrance, CA
Fullerton, CA
Downey, CA
Inglewood, CA
Norwalk, CA
Compton, CA
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit for a deck?
Most cities require a building permit for any deck higher than 30 inches off grade or attached to the house, and some require one regardless of height. Permit requirements vary by city, and pulling one before work starts avoids problems at resale when a buyer's inspector asks for it.
How long does building a deck take?
A straightforward ground-level deck under 300 square feet usually takes one to two weeks from footings to final board. Multi-level decks, composite decking with hidden fasteners, or anything requiring engineered beams can run three to five weeks including permit inspections.
Can a deck be built to a set budget?
A deck can be scaled by square footage, decking material, and railing style to hit a target budget, and that's usually worked out before a contract is signed. Pressure-treated lumber with a basic railing costs significantly less than composite decking with aluminum rail, for the same footprint.
What kind of guarantee comes with the work?
Workmanship is typically guaranteed for one to two years against issues like loose fasteners or boards that cup, separate from manufacturer warranties on the decking material itself, which can run 25 years or more for composite. Warranty terms should be in writing in the contract before work begins.
Who do I deal with during the project?
A single point of contact, usually the crew lead, handles day-to-day questions and schedule updates rather than a rotating cast of subcontractors. That person should be reachable by phone throughout the build.
What materials are used for deck framing and decking?
Pressure-treated Douglas fir or southern yellow pine is standard for framing regardless of what decking goes on top. Decking itself can be cedar, pressure-treated lumber, or composite brands like Trex or TimberTech, each with different cost, maintenance, and lifespan.
Can I still use my yard while the deck is being built?
Most of the yard stays accessible during construction since work is concentrated in the footprint of the deck itself. Expect a staging area for lumber and tools, and some noise during framing and cutting.
What should I do to prepare the site before work starts?
Clear the area under and around the existing deck or build site of furniture, planters, and anything stored underneath. Mark any sprinkler lines or buried utilities in the yard so footings don't get dug into them.
What if a problem turns up once the old decking comes off?
Rotted joists, undersized framing, or a ledger board attached without flashing turn up sometimes once old decking is removed, and that gets flagged with photos before any extra work happens. Any change in scope or cost gets approved before proceeding, not added to the bill afterward.
How should a finished deck be maintained?
Wood decking should be re-sealed every one to three years, with a yearly check for popped fasteners or soft spots near ground contact. Composite decking just gets washed with soap and water a couple times a year, skipping the staining step entirely, but hardware and framing underneath still deserve a yearly look.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (714) 452-1655